Bespoke Bathroom Installation & Design Services

Shower Room Complete Installation

In stock

€ 79.99 Deposit

SKU: FC0FB707-A7C5-6268-4FE9-DC8A407C9C61 Category:

Description

A dedicated shower room demands careful wet-room principles, from tanking to glass panel alignment.

Our complete shower room installation covers:

  • Shower tray or wet-room former installation and waterproofing preparation (tanking and sealing).
  • Shower valve and head mounting, including any concealed body or diverter.
  • Glass enclosure or screen fitting, ensuring stable anchoring and smooth door action.
  • Ancillary items: folding seat, niche shelf, or grab bar as agreed in the specification.

The amount displayed is a deposit. The final fee reflects the room’s footprint, drainage method, and the glass configuration chosen. Please detail your shower room vision via the enquiry form — dimensions, preferred tray type, and any accessibility needs — and we will prepare a fixed installation package.

Shower Room Complete Installation
You're viewing: Shower Room Complete Installation € 79.99 Deposit
Add to cart
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Description
  • Weight
  • Dimensions
  • Additional information
  • Add to cart
Click outside to hide the comparison bar
Compare
shopping cart